Robotics Plus
Casta worked closely with iLine Constrcution throughout this project on the office, warehouse, and external slabs. This project provided many challenges including complex column isolator shapes, multiple construction joint types, and a tight pour schedule.&...
View project
Presidential Homes
Casta worked closely with Presidential Homes throughout this project to meet their requirements for this 8000m2 warehouse slab and 6500m2 external pavement. Presidential Homes specialise in high-quality transportable homes and had outgrown their current Palmerston...
View projectSimplify Your
Concrete Placement.
LET'S TALK

Tauranga Crossing – Stage 3
Our team worked alongside RZG Construction on this marquee project providing Quick-Cast sacrificial formwork and StopForm to help them find significant efficiencies onsite. Using Quick-Cast formwork saved costs compared with traditional timber formwork, sped up...
View project
Liquid Brands – Waterloo Business park
Casta worked closely with Wyatt Construction & Bartlett Concrete Placing - BCP throughout this project to meet the developer & client requirements for their warehouse floor. Joint selection was critical here as the warehouse operations...
View project
Paraparaumu Train Station
This project entailed a concrete apron and footpaths surrounding the Paraparaumu Train Station. With all the different architectural colours and textures of concrete required by the landscape architect, K-Form was the perfect solution to allow...
View project
SafeGuard Storage Hamilton
This project entailed a concrete apron surrounding the main SafeGuard Storage facility. K-Form was used to effect by the construction team as it allowed them to pour the slab with both continuous and stop pours...
View project
Cleanline Tasman
Casta worked with the Chris Bell Construction throughout this build, supplying armoured joints and accessories to maximize the life-span of this fibre reinforced slab. From quantification right through to site visits and setup advice it...
View projectFind The Right Product
For Your Project.
VIEW PRODUCTS

Intertruck Dealership & Assembly Plant
[playlist type="video" ids="3588"] Casta is glad to have been able to speed up the construction process of this impressive facility with K-Form Control Joints and Tuff-Dowel Plates....
View project
Lake Okareka Residential Property
Casta is glad to have been able to speed up the foundation formwork on this cool residential project on Lake Okareka. Quick-Cast sacrificial formwork made the job easier for the site team whilst giving the...
View project
DMS Progrowers Store
Casta is pleased to have provided iLine Construction with Armorforce 4010 for DMS Progrowers in, in conjunction with a fiber reenforced jointless floor....
View project
Hawkes Bay Packhouse
Casta are proud to have provided the WAVE® Joint for this 'State of the Art' packhouse in Hastings, in conjunction with a fibre reinforced jointless floor....
View project
Wanaka Lakefront Pathways
Casta team worked with JFC and other contractors to provide the KForm construction joints, dowels and plastic boxing formwork in this awesome project in Wanaka...
View projectMaking Concrete
Placement Easier.
LET'S TALK

Newline Group Limited
Casta team worked with the slab designers and iLine Construction to provide the steel armored joints, column isolators and other general accessories in this fantastic new warehouse and assembly facility....
View project
FSP Lapetasi International Wharf Development
Fletcher South Pacific used K-Form K135 in the this major port redevelopment in Port Villa Vanuatu. By utilizing K-Form as a construction joint and screed rail, they were able to undertake large continuous pours, providing...
View projectSimplify Your
Concrete Placement.
LET'S TALK

Wellington – England Rds Intersection AKL
Awesome to see our KForm Construction Joint system being used in the concrete intersection in Auckland. No time wasted on 'Hit and Miss' boxing - pour it all at once....
View project
Auckland Southern Motorway SUP
Great to see our Tuff-Form plastic boxing being used in this awesome project running along the Auckland Southern Motorway....
View project
McCarthys Transport Log Handling Yard
Our team provided the jointing and dowel systems for this 15,000m2 log yard in Masterton. By utilizing the K-Form Joint and Tuff-Dowel Round set up, MRB Builders were able to pour multiple consecutive sections without...
View project
Christchurch Central Library
Casta Group worked with Southbase Construction on this iconic project in central Christchurch using K-Form K135 in the foundations....
View project
Cristo Project Christchurch
Casta Group worked with the slab design engineers and Tuatara Structures to provide Armorforce 4010 and Column Isolations in this jointless warehouse floor slab....
View projectFind The Right Product
For Your Project.
VIEW PRODUCTS

PanPac Timber Warehouse Napier
Casta team worked with the slab designers and Stead Construction to provide the steel armored joints in this 10,000m2+ timer storage shed in Napier NZ. With 200kN axle loads with high volume of traffic, joint...
View project
Waimea Group Warehouse and Workshop
We worked with Gibbons Construction and Coman construction to provide the steel armored joints for this warehouse and workshop facility....
View project
MLC Warehouse Motueka
Casta team worked with CJ Industries to provide the steel joints and accessories for this new warehouse project in Motueka....
View project
Margaret Mahy Park Christchurch
We partnered with John Fillmore Contracting and City Care to install K-Form in this iconic project. K-Form was used to speed the project up by removing the need to use conventional ‘hit and miss’ boxing....
View project
Cool Store Extension, Motueka
Our team worked with the developer, engineer and the construction company to provide the steel armored joints, isolation products and dowels for this impressive next stage of the Golden Bay Fruit facility in Motueka. Joint...
View project